Hi Codans!
I want to calcuate a risk score but can’t seem to get the formula to work. Thoughts?
Remove the = sign and the parentheses. You do not have to use thisRow. Simply multiply the columns you want to multiply by typing them with a * in between them.
@anon1959570 - Thank you - Am I doing something wrong here?
Drop the equal sign. Coda does not use the equal sign as an assignment operator.
Took me a while to get used to as well.![]()
Victory! Thank you @anon1959570 !!
This topic was automatically closed 3 days after the last reply. New replies are no longer allowed.